Skip to content
SOVARI Logo
CSI Div 09 — Marble, Stone & Flooring Finishes

Marble, Ceramic & Flooring Works

Supply and installation of natural marble, granite, ceramic, and porcelain for facades and floors using mechanical fixation and mortar.

CSI Div 09

Marble, Stone & Flooring Finishes

Supply and installation of natural marble, granite, ceramic, and porcelain for facades and floors using mechanical fixation and mortar.

Detailed Scope of Work:
  • ✓ Supply & mechanical installation of marble (Cairo Business Hub)
  • ✓ Marble & flooring works at SAMCO Egypt Main Building
  • ✓ High-precision ceramic and porcelain floor installations

Projects delivered in this division

Cairo Business Hub
Marble & Fit-Out Al Shorouk CSI Div 09 • Marble, Ceramic & Gypsum
New Cairo Effect Consultancy

Cairo Business Hub

Supply and installation of mechanical marble facades, ceramic flooring, and gypsum board works.

Partner: Effect Consultancy
Full Project Card
American International School (AIS)
Fit-Out & Finishes AIS School CSI Div 09 • Paints & Gypsum Board
New Cairo Arcmed Office

American International School (AIS)

Execution of interior and exterior paints and gypsum board works at the AIS campus project.

Partner: CRC DORRA
Full Project Card
SAMCO - Main Building
Marble, Flooring & Gypsum SAMCO Egypt CSI Div 09 • Marble, Flooring & Gypsum Board
Cairo SAMCO Technical Office

SAMCO - Main Building

Supply and installation of marble, flooring and decorative gypsum board ceilings at SAMCO Egypt headquarters.

Partner: SAMCO Egypt
Full Project Card
Terrace Zayed
Marble & Fit-Out Terrace Zayed CSI Div 09 • Granite, Marble & Mosaic Tiles
Sheikh Zayed - Giza HTCO

Terrace Zayed

Supply and installation of the project granite and marble works, plus mosaic tiling on the building roofs, with DORRA (CRC).

Partner: CRC DORRA / HTCO
Full Project Card
Lift Stations - 700,000-Feddan Reclamation (Mostakbal Masr)
Infrastructure Mostakbal Masr CSI Div 09 & 26 • Station Finishes & Electrical
Mostakbal Masr - El Dabaa Axis Hydro Consultant

Lift Stations - 700,000-Feddan Reclamation (Mostakbal Masr)

Construction and finishing of the lift stations and their electrical installations within the 700,000-feddan reclamation project, with El Sewedy Infrastructure.

Partner: El Sewedy Infrastructure / Hydro
Full Project Card