SOVARI Integrated Contracting & General Supplies (Since 2014)
Your Trusted Partner forNational Landmarks, MEP, Infrastructure & Fit-Out Works
Since 2014, SOVARI has delivered high-precision electrical works, infrastructure power networks, low-current systems, mechanical installations, marble & ceramic flooring, and steel works across Egypt’s flagship projects.
✓Proven Track Record Since 2014
✓Partnered with Top Tier Contractors & Consultants
✓Integrated Contracting & General Supplies
National LandmarkTotal Air / Alpha
1/4
Grand Egyptian Museum (GEM)
Supply and installation of electrical works at the Grand Egyptian Museum with Total Air Engineering Projects.
Commercial & AdminLeeds / ECB
2/4
Vinci Street - New Capital
Supply & installation of electrical works and low-voltage systems for Misr Italia’s Vinci project.
InfrastructureTIBA Contracting
3/4
550-Acre Government District Infrastructure
Execution of electrical infrastructure works for the 550-acre government district in the New Capital.
Steel & Fit-OutCRC DORRA / Shaker
4/4
Palm Hills Project - Fifth Settlement
Supply and installation of structural steel welding works at Palm Hills Compound with CRC DORRA.
2014
12+ Years of Excellence
+34
Projects in Our Portfolio
6
Engineering Divisions (CSI)
2
Offices: Cairo & Giza
About Us • SOVARI Contracting & General Supplies
A Proven Journey Since 2014 in Integrated Contracting, MEP & Architectural Fit-Out
SOVARI Contracting & General Supplies is a trusted execution partner for Egypt’s leading general contractors and engineering consultants. We specialize in electrical power & cabling, electrical infrastructure networks, low-current systems, mechanical/HVAC & plumbing installations, marble & ceramic works, gypsum board, paints, and structural steel welding.
SOVARI Vision & Mission
SOVARI Contracting & General Supplies was established to combine high-precision engineering execution with reliable material supply. We aim to continually exceed the expectations of Egypt’s premier general contractors and developers.
✓Turnkey supply and installation of electrical, low-voltage, and MEP systems
✓Active contributor to flagship national projects including GEM, New Capital & Galala University
✓Strict adherence to project schedules and consultant quality standards
Approved Track Record with Top Consultants & Contractors
SOVARI has extensive experience meeting the rigorous technical specifications of Egypt’s top engineering consultants, ensuring smooth material approvals and first-time site handovers.
✓General Contractors: Total Air, CRC DORRA, Leeds Fit-Out, Al Shorouk SET, Concrete Plus, SAMCO & Sinoma
✓Certified supply of electrical wires, cables, low-current systems, marble, and architectural finishes
Official Offices & Registered Scope
SOVARI Contracting & General Supplies operates from its head office in Sheraton Heliopolis and its Mohandessin branch, fully registered with the Egyptian Tax Authority e-Invoicing system.
✓Head Office: 74 El Multaqa El Arabi District, Sheraton, El Nozha, Cairo
✓Giza Branch: 29 Mohi El-Din Abu El-Ezz St, Mohandessin, Giza
Supply and installation of complete electrical power systems, wires & cables, distribution panels, and low-current systems for commercial and residential landmarks.
Certified electrical wires & cables supply and installation
Low-current & low-voltage smart building systems
Delivered at Grand Egyptian Museum, Vinci & Galala University
Construction and finishing of the lift stations and their electrical installations within the 700,000-feddan reclamation project, with El Sewedy Infrastructure.
Supply and installation of the stainless steel handrails (metal works) of the El Sewedy University of Technology pedestrian bridge with El Sewedy Infrastructure.
Execution of electrical infrastructure and underground cabling works at Sphinx Station 4.
Official Project Details:
General Contractor: AL-SADEEQ for General Contracting | Scope: Electric infrastructure works.
Hotels & CommercialNazli 4,5Total Air2023
Supply of certified electrical wires and cables for Al Montazah Hotel project in Alexandria.
Official Project Details:
General Contractor: Total Air Engineering Projects | Consultant: Top Engineering Services (Dr. Eng. Mohammed Abu El Fotouh) | Scope: Supply of electrical wires and cables.
Documented quantities & scope
✓ Copper XLPE/PVC cables, sections up to 3×240+120 mm²
✓ About 10,200 m of power and earthing cables
ResidentialTaj CityMNHD / ACE2025
Supply & installation of electrical works and low-voltage systems at Park Residence (Taj City).
Supply of electrical wires for the R3 Residential District in the New Capital with Concrete Plus.
Official Project Details:
General Contractor: Concrete Plus | Consultant: Moharam Bakhom (ACE) | Scope: Supply of electrical wires.
Documented quantities & scope
✓ Copper wires 2, 3, 4 and 6 mm²
✓ About 1,620 coils
National LandmarkGalala Univ.Total Air / ACE
Supply and installation of electrical works at Al Galala University supervised by ACE Moharram.Bakhoum.
Official Project Details:
General Contractor: Total Air Engineering Projects | Consultant: ACE Moharram.Bakhoum | Scope: Supply and install of electrical works.
InfrastructureSharm RoadsTotal Air
Supply of electrical cables for the Sharm El Sheikh highway and road lighting upgrade.
Official Project Details:
General Contractor: Total Air Engineering Projects | Consultant: Sharm El Sheikh City Authority | Scope: Supply of electrical cables.
Residential109 buildingsSinoma - CDI
Supply of all electrical wires and execution of electrical infrastructure works for 109 housing buildings.
Official Project Details:
General Contractor: Sinoma - CDI | Consultant: Misr. Dr. Ouf Dorsch - PSG | Scope: Supply of all electrical wires & electricity works for infrastructure.
Documented quantities & scope
✓ Supply contract for PVC copper wires, 2, 3 and 4 mm²
✓ About 1,575,000 m (1,575 km) of wires
Infrastructure & National ProjectsSinomaSinoma - CDI2024
Supply of aluminium and copper cables for infrastructure works.
Official Project Details:
General Contractor: Sinoma CDI | Scope: cable supply.
Marble & Fit-OutTerrace ZayedCRC DORRA / HTCO
Supply and installation of the project granite and marble works, plus mosaic tiling on the building roofs, with DORRA (CRC).
Official Project Details:
General Contractor: CRC DORRA | Consultant: HTCO | Scope: supply and installation of granite and marble works and mosaic roof tiling.
Construction and finishing of the lift stations and their electrical installations within the 700,000-feddan reclamation project, with El Sewedy Infrastructure.
Official Project Details:
General Contractor: El Sewedy Infrastructure | Consultant: Hydro Consultant | Scope: construction and finishing of lift stations and the stations electrical installations.
Supply and installation of the stainless steel handrails (metal works) of the El Sewedy University of Technology pedestrian bridge with El Sewedy Infrastructure.
Official Project Details:
General Contractor: El Sewedy Infrastructure | Consultant: Hydro Consultant | Scope: supply and installation of the bridge stainless steel handrails.
Connect With SOVARI Across All Social Media Platforms
Follow our latest project handovers in the New Administrative Capital and across Egypt.